BASE HEADER
Gwrthwynebu
Revised Development Strategy
ID sylw: 53782
Derbyniwyd: 28/07/2013
Ymatebydd: Steven Blight
The existing infrastructure which the proposal is based so strongly on is already at saturation. The school has no additional capacity and with the local pub currently closed there only really remains a small local shop to cater for residents.
The fact that the proposal would require changes to the green belt land defeats the objective of having green belt land in the first place and it would be to the detriment of the village as it currently stands.
There is strong objection from the vast majority of the village residents that should be considered and the decision should be reversed.
The existing infrastructure which the proposal is based so strongly on is already at saturation. The school has no additional capacity and with the local pub currently closed there only really remains a small local shop to cater for residents.
The fact that the proposal would require changes to the green belt land defeats the objective of having green belt land in the first place and it would be to the detriment of the village as it currently stands.
There is strong objection from the vast majority of the village residents that should be considered and the decision should be reversed.