BASE HEADER
Gwrthwynebu
Revised Development Strategy
ID sylw: 54139
Derbyniwyd: 29/07/2013
Ymatebydd: Mrs Jane Scott
The concentration of the development in the south of the district - 4550 houses in sites on the edge of Warwick and most of the 1000 village developments will cause severe strain on the local infrastructure. Traffic is already a problem and the mitigation proposals do not address the problems South of Warwick and Leamington. The road through Barford is already grid-locked at peak times with traffic avoiding the direct routes and further large developments in this area will only make the problem worse. If this area is to be developed a major new road south in needed
The concentration of the development in the south of the district - 4550 houses in sites on the edge of Warwick and most of the 1000 village developments will cause severe strain on the local infrastructure. Traffic is already a problem and the mitigation proposals do not address the problems South of Warwick and Leamington. The road through Barford is already grid-locked at peak times with traffic avoiding the direct routes and further large developments in this area will only make the problem worse. If this area is to be developed a major new road south in needed