BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 54884

Derbyniwyd: 29/07/2013

Ymatebydd: Andrea Lambert

Crynodeb o'r Gynrychiolaeth:

Objects to 2013 Local Plan and the many planning applications associated with it on following grounds:

* unfairly places the bulk of the proposed housing in one concentration to the south of Warwick/Leamington and around Whitnash.

* long term coalescence of settlements,
* loss of significant open space,
* loss of local countryside,
* loss of agricultural land,
* lead to significant urban sprawl,
* excessive bulk and scale,
* significant overdevelopment of the area,
* Increased pollution already above acceptable national guidelines.
* Impact on existing road infrastructure which is already at capacity-situation will become untenable.

* traffic heading towards the town centres is already a major problem,
* gridlock, will lead to increased pollution
* congestion on rural roads outside the town at peak times is also already a problem
* traffic noise,
* potential increased danger to pedestrians and children.

* Is contrary to NPPF [Policy DC7]

Impact on local infrastructure and amenities including:

* pressure on local schools
* primary schools already oversubscribed year on year
* increased pressure on the local secondary schools
* effect on catchment areas
* effect on applications from siblings of children already in one school
* new schools not "guaranteed" to be built as part of the developments
* limited access to doctors and dentists surgeries in the Whitnash and Warwick Gates and Myton areas already
* effect on increased numbers on the local hospitals
* contrary to NPPF [Policy DC7]

* Impact on Flood Risk:

* already flood issues in Whitnash and Warwick Gates
* scale and density of proposed housing,
* large areas of paved/concreted or tarmac surface etc,

Alternatives that should be considered include:

* Identifying existing housing that is derelict or currently unoccupied,
* Identifying empty industrial units with a view to use the land for brownfield site housing.
* Identifying an area in the surrounding countryside to use to build an entirely "new town".
* Spreading the numbers of new homes evenly around the district, with lots more much smaller developments.
* Smaller developments given to local builders rather than large national firms, thus helping the local economy.