BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 55142

Derbyniwyd: 23/07/2013

Ymatebydd: Rod Wheat

Crynodeb o'r Gynrychiolaeth:

By leaving existing identified areas of employment land alone, and employing reasonable and common-sense assessments of the levels of flexibility and error-margins required, there is already more than enough employment land available to WDC, without having to undertake further development in the green-belt.

Already a gross over-supply of employment land available. Assessment of employment land requirements is unjustifiable, idiosyncratic, and frankly bizarre. The inflated guesstimate of requirements turns a proven and substantial over-provision into an unjustified deficit. Most of this requirement will be provided by our ever-dwindling reserves of green-belt.

Table 4 attempts to justify the fantastical and fatuous deficit claim. Subsequently, in section 4.5.8, the 17.5ha of the 'balance to be allocated' is arbitrarily and randomly inflated by a completely unjustified 5ha (29%) to 22.5ha in order to allow for flexibility and the assumptions used in modelling and forecasting. What is the 16.5ha of the 'Margin to provide flexibility of supply' designed for if not "To allow for flexibility and the assumptions used in modelling and forecasting"?
Ridiculous for WDC to double-bubble this figure by re-including the same thing again. Presumes this is a try-on designed to artificially inflate these numbers to suit WDC's aims over those of its ratepayers and parish councils? The whole rationale behind a margin of error is that it is a plus or minus figure - it can go up or down (and should be thus marked) - but in WDC's case, it only ever works in the one direction - and that is always to the detriment of our environment and green-belt.

Council attempts to claim that 'it is reasonable to provide an additional 22.5 hectares of employment land'. Under no circumstances is this a reasonable or a justifiable thing to do. This claim is an entirely false construct, based on an entirely false premise, and it is entirely and demonstrably unreasonable.

The 16.5ha of the 'Margin to provide flexibility of supply' is already an enormous 46% margin over and above requirements - being the 36ha of 'Net employment land requirement'. Adding in WDC's 5ha inflates this already huge 'margin of flexibility' up to 60%. Something is dreadfully wrong with the forecasting.

Cannot afford for Warwickshire's ever-diminishing green-belt to be squandered in such a wasteful, unaccountable and profligate fashion. Rather than the 16.5ha to 21.5ha that WDC currently propose, a much more reasonable, justifiable and acceptable 'Margin to provide flexibility of supply' would be around 1.8ha to 3.6ha (5% to 10%), but certainly no more.

Concerned re taking areas previously identified as Employment Land out of that use, and instead allocating them to the house building plans. Aware that this is being dealt with by a large number of local and parish councils - agrees with their criticisms and arguments.

Table 4 - on the 'Demand' side there is 13.5ha of land identified as 'Potential re-development of existing employment areas'. Figure has been brought about by Council's convoluted but erroneous logic. It is only necessary to include it now because of the unjustified and arbitrary 'change of use' of existing employment land to housing use. Subsequent sections spell out in detail how WDC are in fact planning to remove a total of 19.5ha of existing employment land, in order to replace it with 13.5ha of new employment land elsewhere. However in section 4.3.9, and despite the use (twice) of the word 'some', and the specific inclusion of 'and employment use', nowhere in this section does it mention WDC's actual intention, which is to take all of this land out of employment use. Employment land should be redeveloped as employment land - as was intended and envisaged originally. Left to conclude that WDC are not convinced that the demand for employment land is there. Previous attempts at justification for this topic (Gateway) are weak.

Unacceptable to take brownfield land out of employment use and then immediately replace it with employment greenfield land, especially when much of this will be green-belt land.