BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 55285

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Barry Horsley

Crynodeb o'r Gynrychiolaeth:

Objects to the bulk of the proposed housing in one concentration to the south of Warwick/Leamington and around Whitnash.The scale and proportion of proposals will lead to long term coalescence of settlements, loss of significant open space, loss of local countryside,loss of agricultural land, significant urban sprawl, excessive bulk and scale, significant overdevelopment of the area, and increased pollution.
Road infrastructure south of Warwick is already stretched,development could generate 9,000 extra vehicles accessing the network, traffic heading towards the town centre is already a problem and this will increase gridlock.
The NPPF does not permit development which would generate significant traffic movement unless mitigation measures are used to avoid adverse impacts, does not believe that measures will alleviate the problem.
The NPPF does not allow development which would have an unacceptable adverse impact on the amenity of nearby users and does not provide acceptable facilities for future occupiers. Development in this area will place further pressure on already overscribed primary and secondary schools, limited places in doctors and dentist surgeries in the Whitnash, Warwick Gates and Myton areas and numbers using local hospitals.
There are already flood issues in Whitnash and Warwick Gates, proposed scale and density of development will create large concreted areas.
Alternatives to the local plan which should be considered are: identifying existing derelict or unoccupied housing, identifying empty industrial units to use for housing, building a new town, spreading the development in smaller numbers across the district, smaller developments by local builders rather than large national firms to help the local economy