BASE HEADER

Cefnogi

Revised Development Strategy

ID sylw: 56271

Derbyniwyd: 29/07/2013

Ymatebydd: Environment Agency

Crynodeb o'r Gynrychiolaeth:

Eastern boundary of the site is within Flood Zone 2 and Flood Zone 3 of the Whitnash Brook. The Sequential Approach to flood risk management outlined within the NPPF and Tables 1, 2 and 3 of the supporting Technical Guide should be applied to ensure that new development is directed towards the areas of lowest risk, and only proposed in areas of floodplain if it is absolutely necessary.

Map 4 shows a Local Wildlife Site buffer along the line of the watercourse and including its indicative floodplain. The EA support this approach to protecting the watercourse and the surrounding Local Nature Reserve as it ensures vulnerable development is steered away from this area of risk and that an unobstructed river corridor is maintained for flood risk and habitat benefit.

Providing that the Local Plan confirms the extent of development will not encroach into Whitnash Brook floodplain (including the medium risk Flood Zone 2 as well as Flood Zone 3) then this should not pose a problem at this stage. Further modelling as part of Level 2 SFRA may be required.

Any works in this location should look to preserve and enhance the ecological status of the river corridor.