Revised Development Strategy

ID sylw: 56434

Derbyniwyd: 29/07/2013

Ymatebydd: CPRE WARWICKSHIRE

Crynodeb o'r Gynrychiolaeth:

In August 2012 CPRE responded to WDC's Preferred Options raising issues including the amount and location of employment land proposed in the emerging plan. Our conclusion on employment land in 2012 was that "no new development of employment land in the Green Belt is justified". The Revised Development Strategy increases our concerns that WDC's emerging plan is unsound. Section 3.5 of the Revised Development Strategy (May 2013) summarises sustainable development principles including "avoiding coalescence". But WDC's proposals fail to achieve this principle. The so-called Sub-Regional Employment Site would cause coalescence of Coventry and Baginton and the proposed Thickthorn developments would erode significantly the separation between Kenilworth and Leamington. The proposals are not sustainable.

There is in fact an excess of employment land already available in Warwick District. The issue of the amount of employment land is mainly caused by WDC's approach to the assessment of Employment Land Requirements. This approach turns a substantiated excess of employment land into a claimed deficit of employment land, resulting in the proposed policy RDS6 which specifies that 22.5 hectares of new employment land should be allocated between 2011 and 2029, mostly in the Green Belt.

Section 4.5.8 takes the bottom line of table 4 (Row H 'Balance to be allocated') figure of 17.5ha and increases this figure to 22.5ha in order "to allow for flexibility and the assumptions used in modelling and forecasting". The latter 'buffer' of 5ha overlaps with the Item B 'Margin to provide flexibility of supply' of 16.5ha. This is double counting. Error in modelling/ forecasting can go either way (plus or minus), not just one direction. The claim that "it is reasonable to provide an additional 22.5 hectares of employment land" is entirely unreasonable.

The established requirement is 36ha; against this, 16.5ha 'Margin to provide flexibility of supply' is itself excessive: almost 50% extra on top of the established demand of 36ha in order to provide 'choice'; this seems to be an unjustified excessive amount of flexibility. The environment cannot afford such generous luxury of flexibility. A 10% contingency should be sufficient 3.6ha rather than 16.5ha.

The final component in the demand side of table 4 is Item C 'Potential redevelopment of existing employment areas', amounting to 13.5ha. Although this seems at first sight to be supply rather than demand, more employment land is claimed to be needed because of the unjustified change of use of existing employment land, removing it all from the employment portfolio and allocating it to housing. Sections 4.5.19-4.5.20 (and 4.2.4) describe the proposal to remove 19.5ha of existing employment land and replace it with 13.5ha of new employment land.

The proposal to take all of this land out of the employment portfolio conflicts with other sections of the consultation document. Section 4.3.9 makes quite clear that some of the 'tired' employment land could be released for housing development. No justification is provided for taking all of the land out of employment use; there seems to be no reason why such employment land should not be redeveloped for continuing employment purposes (if demand is really there). It is extreme to assume that all of this land will be 'lost' to employment uses. It is not acceptable to take brownfield land in urban areas out of the employment portfolio and replace it with greenfield land outside urban areas, much in the Green Belt. The strategy should be to improve effective use of the 19.5ha for continuing employment use.

Established numbers in the above table show the base demand as 36ha (Item A) and the base supply as 48ha (Item F). The unadjusted numbers show an excess of employment land of 12ha. This excess provides ample flexibility and margin for error. A corrected version of Table 4 is provided below:

Table 4 Revised
Demand
Net employment land requirement 2011-30: 36 has
Margin to provide flexibility of supply: 3.6 has
Increased effectiveness of use of existing employment areas: 0 has
Total gross employment requirement (demand): 39.6 has
Supply
Completed employment land since 2011: 0.47 has
Current available land supply: 48 has
Total gross employment land supply: 48.5 has
Excess providing even more contingency and flexibility: 8.9 has

Through double counting, unreasonable buffers and unjustified changes of use, WDC has transformed an excess of employment land of 8.9ha into a misleading claimed deficit of 22.5ha. This cannot be justified. The misleading claimed deficit is then used to try to justify development of new employment land in the Green Belt (section 4.6):
* Thickthorn (8ha) between Kenilworth and the A46;
* Part of the Coventry Gateway site (6.5ha) around Baginton and Coventry Airport.

By protecting existing employment land and by making more reasonable assessments of buffers and flexibility, there is ample employment land available without development in the Green Belt.