BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 56827

Derbyniwyd: 29/07/2013

Ymatebydd: The Warwick Society

Crynodeb o'r Gynrychiolaeth:

Many options exist but have not been given proper consideration in the preparation of the RDS. Lower housing numbers which meet local needs, especially for affordable housing, instead of encouraging in-migration; the gradual release of land for development as demand grows; giving absolute priority to using brownfield and infill sites; building homes close to jobs and not mainly within 20% of Warwick District.

Absolute priority should be given to brownfield sites, with greenfield sites only being allocated when there is a proven immediate need. This will ensure that more brownfield sites become available, their value increased by the non-availability of easy, profitable alternatives for the mass housebuilders.

While a year ago the IBM/Opus 40 site on the north-west edge of Warwick was to be used for office development, it is now likely to be proposed for housing. It provides a good example of the way in which long-term plans are by their nature crude, and that housing sites can be found on brownfield sites well-connected to the transport network.

The agricultural land between Warwick, Whitnash and Bishop's Tachbrook is an 'Area of Restraint', designated at the time of the construction of the Warwick Technology Park, and intended to give permanent protection to this vital green gap. It should be designated as Green Belt, but the Council has refused to implement this.

Building on it would merge the built-up areas, turning them into a single suburban sprawl. This would conflict directly with one of the principles of the Local Plan Strategy, 'avoiding coalescence'. The green space between the built-up areas to the south is as important as the Green Belt to the north of Leamington and Warwick, and it should be safeguarded as strongly. Its development would conflict with the basic principle of sustainability.

The already illegally dangerous pollution in streets in centres of Warwick and Leamington would be made worse by the increase in traffic. Noise and vibration would be constant and business and residential amenity would be damaged.

No attention has been given to the requirement to reduce the impact of traffic on Warwick town centre, and in particular to reduce the level of noxious emissions. This failure invalidates the infrastructure plan. The health of residents, as well as the town centre economy and the conservation of its historic buildings, all require air quality to be given absolute priority.

Suggested by the Council that the air quality requirement could be met after development has been approved by then considering ways in which traffic through Warwick town centre could be reduced. This approach would invalidate the Transport Strategy, as the only way to reduce the volume of traffic would be transfer to other modes or other routes, neither of which has been assessed in the Strategy.

A transport plan which meets all the objectives, including protecting the historic environment and assuring air quality, must be agreed before development is allocated.

Warwick's historic environment is vital both to the social goals of the plan, to give people a sense of place and belonging, and to the economic goals as the basis of its visitor economy. It would be directly damaged by the increase in traffic and by building wide new junctions cluttered with traffic lights and signs at beautiful places: at Bridge End, over the Castle Bridge, on Castle Hill, and at St John's.