ID sylw: 61147

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Christine Watkinson

Crynodeb o'r Gynrychiolaeth:

I support WDC Preferred Option. The site would be large enough to contain all construction work and vehicles/deliveries during the build phase.
If the housing was split all over the village on different sites the congestion caused with pavement parking etc. would cause havoc throughout the village.
The site already has a footprint of old buildings and a lot of concrete areas. It would not be like digging up a beautiful green field and so would preserve the green belt around the village.

Testun llawn:

I support WDC Preferred Option. The site would be large enough to contain all construction work and vehicles/deliveries during the build phase.
If the housing was split all over the village on different sites the congestion caused with pavement parking etc. would cause havoc throughout the village.
The site already has a footprint of old buildings and a lot of concrete areas. It would not be like digging up a beautiful green field and so would preserve the green belt around the village.