BASE HEADER

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61154

Derbyniwyd: 20/01/2014

Ymatebydd: Mr Stan Sabin

Crynodeb o'r Gynrychiolaeth:

Preferred sites 1 and 4 are the only ones that do not extend the village envelope. Previously these sites would have been referred to as infilling.
By approving any kind of development on sites 2 and 3 will inevitably lead to further applications to build in an easterly direction. There is also the real threat of exacerbating the risk of flooding in the Valley and Valley Road by building on site 2 as the natural slope of the land drains into the stream at the bottom of the site.