BASE HEADER
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 61660
Derbyniwyd: 15/01/2014
Ymatebydd: Mrs Jennifer Morris
Crynodeb o'r Gynrychiolaeth:
-Worried that vehicle access to their new gate will be lost.
-Foul drainage is already inadequate form the recently built social housing. The air pollution we have to endure approximately every six weeks is totally unacceptable.
-Traffic is become heavier. Most homes have at least two cars. In an emergency situation the roads can often be blocked.
-A child play area is needed never mind extra homes.
-The area has been left undisturbed for many years and it is now a very interesting natural reserve. There is a great variety of wild flowers, trees and birds.
Testun llawn:
see attached