BASE HEADER
Cefnogi
Village Housing Options and Settlement Boundaries
ID sylw: 61995
Derbyniwyd: 15/01/2014
Ymatebydd: Mrs Brenda Woodhead
Crynodeb o'r Gynrychiolaeth:
Support not developing on Site 4 because:
-Need to preserve the identity of the village by protecting it from merging with Leamington Spa.
-Protection of the landscape to the south is equally important.
-School Lane cannot be widened which would be the access route to the site.
-School access on School Lane is already dangerous during busy pickup and drop off points.
-There would be hazardous conditions for school children should there be construction traffic.
-Proposed development would have a very high impact on the village centre.
-Cannot walk down School Lane as parents park on the pavement/grass verges.
Testun llawn:
see attached