BASE HEADER

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63201

Derbyniwyd: 17/01/2014

Ymatebydd: Sharba Homes

Asiant : PJPlanning

Crynodeb o'r Gynrychiolaeth:

-Area is by far the most sensitive location in the village.
-The highway conclusions presented by the local authority are based on partial work and studies that are disparate to the more detailed studies of the promoting developer. There is the risk that a site is allocated on the false premise of a highways solution that is not achievable, and then condemns the village to a development that will need to use a far more unacceptable access.
-Feature of the village would be ruined by significant infrastructure upgrades needed to sustain development.
-There are much less sensitive sites for housing.

Testun llawn:

see attached

Atodiadau: