BASE HEADER
Gwrthwynebu
Preliminary Draft Charging Schedule
ID sylw: 63279
Derbyniwyd: 26/07/2013
Ymatebydd: H E Johnson
Asiant : Bond Dickinson LLP
Crynodeb o'r Gynrychiolaeth:
Appendix A
The Residential Zones plan shows land between Lillington and Cubbington as Zone A and the extended RHF site shown by a broken red line at Figure 1 to Appendix 1 of the Bruton Knowles Representations, in Zone D for the purposes of the Draft Charging Schedule. We object to this categorisation and submit that it is necessary to categorise the whole of the RHF site in zone A and define it as a Strategic Site with the lower charging level for regeneration purposes and that the land between Lillington and Cubbinton, which the SHLAA identifies as not suitable for development, is categorised at the higher level Zone D.
Testun llawn:
see attached