BASE HEADER

Gwrthwynebu

Preliminary Draft Charging Schedule

ID sylw: 63312

Derbyniwyd: 13/08/2013

Ymatebydd: King Henry VIII Endowed Trust (Warwick)

Asiant : AMEC

Crynodeb o'r Gynrychiolaeth:

Have concerns about the five sites that were considered in the viability study. Blackdown is now not in the RDS and it would have a much higher land value than sites to the South of Warwick and Leamington.

Testun llawn:

see attached

Atodiadau: