BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 63427

Derbyniwyd: 23/07/2013

Ymatebydd: Mr Dennis Michael Crips

Crynodeb o'r Gynrychiolaeth:

Studies have shown that the scale of development proposed in this area can be accommodated on the transport network subject to appropriate mitigation measures being forward' - At peak times only, and only when the schools are in session the measures will reduce the traffic burden to less intolerable levels and which will result in yet further deterioration of air quality in our towns. These mitigating measures actually make matters worse during off-peak periods.

-The potential constraints of the capacity of the Avon Bridge has not been addressed. There is great concern about the fatigue life of masonry arch bridges. The 7.5 tonne weight limit is routinely ignores and offers no protection. The STA makes no mention of the bridge which is pivotal to the proposal.

Testun llawn:

see attached

Atodiadau: