Mitigation Scheme: Myton Road Roundabout signalisation
No evidence has been presented that pedestrian stages have been included in the signal cycle. If they have not been considered this is a very serious omission considering the volume of pedestrian traffic, especially schoolchildren, at peak times. If pedestrian stages have been included, then it will result in the loss of about 20% of highway capacity at peak times and it is therefore unlikely that the junction will be able to serve more vehicular traffic.