BASE HEADER

Gwrthwynebu

Publication Draft

ID sylw: 6392

Derbyniwyd: 25/09/2009

Ymatebydd: Ed & Zoe Rycroft

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

Huge increase in traffic arising from at least 8000 new cars in this area will result in pollution and add to existing air quality problems in local town centres.

At peak times the local roads are almost at gridlock. Traffic in the morning queues, it stretches from town, down the A452 and also onto the M40 at junction 14 back to the Warwick junction 15. Surrounding roads are grid locked as a result.

Proposed development will add to this congestion.

No evidence to suggest current problems will be fixed now or in the future.