BASE HEADER
Gwrthwynebu
Preferred Options for Sites
ID sylw: 64945
Derbyniwyd: 02/05/2014
Ymatebydd: Barwood Strategic Land II Limited
Asiant : HOW Planning LLP
Sites must be deliverable and available yet site GT05 will require a CPO and so does not meet the policy requirement. There is no indication of the relative weight to be placed on each criteria but it is not rational to identify a site as Preferred or Alternative if CPO powers are required. As CPO powers must be seen as a last resort, the Council must be able to demonstrate that all other options have been considered. It is clear that the site selection process is flawed and has not been adequately evidenced or explained, which will undermine the Council's case. The time and costs involved in the CPO process mean that there is no guarantee that the sites can be delivered in a reasonable timescale or at all and therefore cannot be considered as deliverable. This in turn makes the Plan unsound.
Site GT05 should be reclassified as "not suitable" (Red).
see attached