BASE HEADER

Gwrthwynebu

Preferred Options for Sites

ID sylw: 65028

Derbyniwyd: 21/04/2014

Ymatebydd: Sarah Smith

Crynodeb o'r Gynrychiolaeth:

This key point has not been mentioned in the commentary within Section 7 which is a major omission on the part of the Council and once again misrepresents the actual situation at GT19:
* Aware that the Council recently rejected the proposed development of a similar site between the canal and Birmingham Road owned by Mr Arkwright, closeby to the west along the Birmingham Road.

* How does the Council reconcile the refusal of this proposal with listing GT19, a similar nearby site, as a Preferred Site?
* Access to the road network is not safe - Birmingham Road is 2-way and heavily congested, particularly during peak times. There was a fatal traffic accident immediately outside the proposed site in 2010.
* Given the congestion, how does the Council think that the movement of large vehicles into and out of the site will be managed?
* There is the possibility of flood risk from the adjacent canal and fields to the north of Birmingham Road, which flood regularly. Part of the site is within high flood risk Zone 3 (the proposed site is only 0.3 acres in size).

* With part being within a high flood risk Zone- why has GT19 therefore been proposed as a preferred site?
The landowner is not willing to sell the site, so compulsory purchase powers would have to be used to bring the site forward. It seems that other sites are not preferred because of this.
Why has GT19 therefore been proposed as a preferred site?
"Site area reduced to avoid other existing uses and retain viability of remaining unit"
There is no proof or even indication that this will be the case
What evidence is the Council using to make this statement? Please respond.

Testun llawn:

9. Summary of Preferred Option Sites
GT19 (p.42) - OBJECT
Against the Council's own criteria in sec...
[dangos mwy]