BASE HEADER

Gwrthwynebu

Preferred Options for Sites

ID sylw: 65292

Derbyniwyd: 05/05/2014

Ymatebydd: Mr & Mrs Edwards

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

No shops, local services or good local transport within a 5-10 walk. Schools / GP surgeries at least a
45 minute walk away. Will increase car use so location not sustainable.

Not on community periphery to encourage integration.

No infrastructure (roads, pavement, street lighting, broadband, cellphone reception).

Nearest primary, junior and senior schools & GPs are already at capacity.

Area is prone to flooding. Unable to use soak away or runoff based drainage systems as soil is clay based. Will require connection to mains sewerage which does not exist in Harbury Lane.

Harbury Lane and Fosse Way crossroads is a high risk travel route with high volumes of traffic and an increasing number of accidents.

Children will be at risk waiting for school transport.

Within zone of aerial discharge from Barnwell Chicken farm.

Within 400m of the Harbury Lane Breakers yard which generates noise and air pollution.

An expensive site to develop. Who will have to pay if gypsies and travellers will not pay for it?

Good quality farmland fully utilised for livestock and arable farming will be lost

The site will damage wildlife habitat.

Will lack integration into the landscape and would spoil the views from Chesterton Windmill