BASE HEADER

Gwrthwynebu

Publication Draft

ID sylw: 65480

Derbyniwyd: 27/06/2014

Ymatebydd: Sarah Palmer

Asiant : Davies and Co

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

The objection is to the omission of land on the north-east side of Red Lane (i.e. opposite allocated site H24 and immediately south-east of the houses on Red Lane that form part of the main built-up area of the village) as a housing allocation.

Testun llawn:

The objection is to the omission of land on the north-east side of Red Lane (i.e. opposite allocated site H24 and immediately south-east of the houses on Red Lane that form part of the main built-up area of the village) as a housing allocation.

Atodiadau: