BASE HEADER

Sylw

Preferred Options for Sites

ID sylw: 65592

Derbyniwyd: 12/05/2014

Ymatebydd: Environment Agency

Crynodeb o'r Gynrychiolaeth:

Any application would require a Preliminary Risk Assessment to assess the possible impact of contamination on water receptors.

Site will need a non- public foul mains sewer solution. The site should not drain to the south because of the potential impact on the water environment which already has high levels of phosphates.

A suitable means of dealing with foul effluent will be required.

The local wildlife trust and county ecologist should be consulted about potential impacts on ditches, watercourses, Whitnash Brook and Warwickshire Habitat Alert Sites.

Flood risk from alluvial sources is unlikely now the site has been reduced in size but any development must have regard to surface water flooding and localised ponding.

Testun llawn:

see attached

Atodiadau: