ID sylw: 66424

Derbyniwyd: 27/06/2014

Ymatebydd: Hazel and Robin Fryer

Crynodeb o'r Gynrychiolaeth:

Paragraph 4.52, 5.51 & 5.65 - SA Objectives 5 & 9
a) Thickthorn housing; the surface water drainage problems that will result from this large area of development has not been considered and currently all the run-off from the fields is into a small stream flowing through the village of Ashow. In recent years serious flooding has occurred and a 400mm diameter bypass pipe was installed but this will be totally inadequate to take the increased flow from the development.
b)This aspect of sustainable development for the site has not been evaluated.