BASE HEADER
Gwrthwynebu
Publication Draft
ID sylw: 66615
Derbyniwyd: 26/06/2014
Ymatebydd: Mr William Blagburn
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
The Local Plan does not include the need for Warwick University to expand or any anticipated housing required for the 10,000 employees to work at the Coventry & Warwickshire Gateway Site if it goes ahead.
Why does the Plan not refer to the Kings Hill site as there may be a case for it to go ahead to meet the future needs as it is near both the University of Warwick & Gateway. The increase in congestion of the already hard pressed local road structure will need dramatic action.
The B4113 which already services the developing sites of Stoneleigh Park & Abbey Park will not only have to take increased traffic to/from Gateway from the South but cope with this possible increased housing.
WDC should consider replacing the B4113 river bridge at Stoneleigh, which can not even take two HGV vehicles crossing at a time. If the river bridge was sited 450m upstream a small by pass could be built to bypass the village completely and cut out many of the traffic problems caused by the village being sited on the cross road and river bridge.