It is an important part of the local plan that the necessary infrastructure required is provided.

The financial contributions will not deliver the level of funding required for infrastructure, meaning the necessary infrastructure is not provided or that it has to come from other source which the current inhabitants will have to meet the cost of. There is no plan in place to deliver infrastructure.

If the housing needed is spread around the district, then some of the existing infrastructure can take up the spare capacity and in some ways that can be a good thing. But large amounts of new housing are concentrated in one place then large amounts of new infrastructure cannot be avoided.

Independent assessment indicates that the costs of the infrastructure required will be between £30m to £50m more than the income that will be received. Further this additional infrastructure will require sites upon which to place the facilities and these had not been selected nor has any land acquisition cost been included.

We find compared with an expenditure of in the region of £230m income that will be recovered to pay for those costs will be about £190m, leaving £50m unfinanced.
If the reduced population now known is taken into the plan then much of the infrastructure listed will cease to be required, because the sites are already known and are well distributed around the district.