BASE HEADER
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68101
Derbyniwyd: 16/03/2016
Ymatebydd: Mr Charles Cain
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The infrastructure cannot cope with added vehicles on the A4177. The traffic will be a danger to school children who get the bus from Hatton park or cross the traffic to use Ugly Bridge Road.
The roads and fields flood. There is no plan to cope with this.
It is prime green belt land that provides a natural boundary for the existing development.
The infrastructure cannot cope with added vehicles on the A4177. The traffic will be a danger to school children who get the bus from Hatton park or cross the traffic to use Ugly Bridge Road.
The roads and fields flood. There is no plan to cope with this.
It is prime green belt land that provides a natural boundary for the existing development.