BASE HEADER
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68187
Derbyniwyd: 09/04/2016
Ymatebydd: Mrs Ingrid Oliver
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The original plan was for 80 new houses for Barford, now 155 - far too many for a VILLAGE of approx. 700 existing buildings. Current infrastructure will not support this number - e.g. sewage, drainage. Average of 2 cars per new house would mean a huge traffic increase. Site H48 access through Bremridge would cause problems -road congested already - cars parked on kerbs, and a dangerous exit onto the Wellesbourne road. H47 exit onto Wasperton Lane where cars are travelling fast, and there is often excessive traffic (e.g. when there are problems on local motorways) would be dangerous.
The original plan was for 80 new houses for Barford, now 155 - far too many for a VILLAGE of approx. 700 existing buildings. Current infrastructure will not support this number - e.g. sewage, drainage. Average of 2 cars per new house would mean a huge traffic increase. Site H48 access through Bremridge would cause problems -road congested already - cars parked on kerbs, and a dangerous exit onto the Wellesbourne road. H47 exit onto Wasperton Lane where cars are travelling fast, and there is often excessive traffic (e.g. when there are problems on local motorways) would be dangerous.