BASE HEADER
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68484
Derbyniwyd: 21/04/2016
Ymatebydd: Irene Burden
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation from Irene and Raymond Burden.Surface water drainage from the H50 fields will require a sustainable urban drainage system to be employed within any development. We consider that even with such a system the risk of flooding of susceptible parts of the village will be unacceptably high.---Building the proposed number of homes will increase traffic on the B4453 Rugby Road, which isalready high at peak periods. Road access for H50 may be problematic when the road is embanked in order to bridge the HS2 line.
This is a joint representation from Irene and Raymond Burden.Surface water drainage from the H50 fields will require a sustainable urban drainage system to be employed within any development. We consider that even with such a system the risk of flooding of susceptible parts of the village will be unacceptably high.---Building the proposed number of homes will increase traffic on the B4453 Rugby Road, which isalready high at peak periods. Road access for H50 may be problematic when the road is embanked in order to bridge the HS2 line.