BASE HEADER
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69258
Derbyniwyd: 22/04/2016
Ymatebydd: CEG Steel/Pittaway
Asiant : Nexus Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
S1 could come forward as part of a comprehensive development with site H42, delivering up to 1,500 dwellings and at least 425 dwellings within the Plan period. This would not address all development pressures south of Coventry and should be seen an initial phase of wider development growth.
WDC should prepare an Area Action Plan (AAP) for the wider area south of Coventry, rather than dealing with it through a partial review of the Local Plan. The broad area could be referenced in the Local Plan with the exact extent determined through the preparation of the AAP itself
see attached