BASE HEADER

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69482

Derbyniwyd: 21/04/2016

Ymatebydd: Centaur Homes

Asiant : McLoughlin Planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Support the Council in meeting its Duty to Cooperate and the increase in housing need to accommodate unmet need from outside the District. However, this unmet need should not be separated out from the Warwick's actual need.
The 2015 SHMA has a critical role in preparing a sound Local Plan. However the SHMA covers a 20-year period, but the plan period is 18 years. To allow for this, the Council has applied a pro-rata figure to the plan period. Although the total need over the 20 year period is known, the breakdown of demand for housing during the period is not, it is not a constant perfect linear line, but dynamic.
The Plan's target of 16,776 new dwellings is not justified and potentially could under deliver in the short term. Failure to provide the required level of housing will further compound supply problems, hinder economic growth and fail to address affordability. Warwick District is less affordable, than the England average.
If the Council insist on using a figure different to that in the full OAN identified in the SHMA, this figure needs to be justified for the shorter period. In accordance with the need to "boost" housing supply the housing target should be expressed as a minimum to provide for additional flexibility for any under-delivery on allocated sites