ID sylw: 70349

Derbyniwyd: 21/02/2017

Ymatebydd: Mrs Ann Kelsey

Crynodeb o'r Gynrychiolaeth:

CIL contribution should be applied to all new developments as all benefit from the infrastructure.
For housing, this contribution should be a very small percentage of the market value of the property, which would enable the quantum assessment to accommodate economic fluctuations and be up-to-date without the need to frequently reassess the whole schedule. It would share the burden more equitably.
An overly complex model has resulted in a schedule which is both cumbersome and unfair.
Of the 5 strategic sites selected for the Viability Study, Blackdown was by far the largest designated for up to 1600 houses, but failing to include construction and maintenance of supporting infrastructure such as school, medical services, green spaces or shops. This site had been removed which makes nonsense of including it in a meaningful Viability Study.
Blackdown and Old Milverton are rural farming areas but were categorised in the 2013 CIL as urban fringe development areas. This issue was raised in the submissions at that time but has not been corrected.
These farming parishes consist of just a hamlet, surrounded by extensive fields. The land values should be in the highest rural category for the purpose of accurate CIL calculations.
If the complex viability study had been based on accurate information, then more confidence could be placed in the Draft Community Infrastructure Levy Report being reliable, useful and worthy of support.
Further thoughts for consideration
1. Further adjustments should be considered to take into account infrastructure projects that may never be built
2. The infrastructure levy should be applied just to those who would benefit most from the proposed developments.