BASE HEADER
Gwrthwynebu
Publication Draft
ID sylw: 7113
Derbyniwyd: 25/09/2009
Ymatebydd: The Warwick Society
Assertion that appraisal of infrastructure needs of each of proposed sites could only be carried out once preferred option is confirmed is ludicrous. Limitations of transport infrastructure serving these sites are implacably worsened by geography: Avon, crossed only at Castle Bridge in Warwick and Princes Drive in Leamington is absolute barrier - these bridges already saturated by traffic. Availability of infrastructure - transport, energy, water, sewerage, educational and other social needs is essential and choice cannot be made until after appraisal has been completed.
Concerned that, in absence of such appraisal, damaging impact of development on Warwick Town Centre through generation of traffic will be overlooked.