BASE HEADER
Sylw
Land East of Kenilworth Development Brief
ID sylw: 71286
Derbyniwyd: 09/01/2019
Ymatebydd: Individual
a) Chapter 9, p151 - Traffic problems likely by having two access points. At peak times the flow of traffic past the indicated Leamington Rd junction is extremely heavy and the consequence of constructing a further traffic inflow at this point would add to the burden that drivers have to face during the weekday commute. Far better would be to use solely, the junction directly from the A46 roundabout, through the industrial sector and onto the spine road. Two junctions are unnecessary when one will suffice, remove the spine road junction onto the main Leamington bound main road.
a) Chapter 9, p151 - Traffic problems likely by having two access points. At peak times the flow of traffic past the indicated Leamington Rd junction is extremely heavy and the consequence of constructing a further traffic inflow at this point would add to the burden that drivers have to face during the weekday commute. Far better would be to use solely, the junction directly from the A46 roundabout, through the industrial sector and onto the spine road. Two junctions are unnecessary when one will suffice, remove the spine road junction onto the main Leamington bound main road.