BASE HEADER
Gwrthwynebu
Land East of Kenilworth Development Brief
ID sylw: 71293
Derbyniwyd: 22/12/2018
Ymatebydd: Mr Edward King
a) The road system cannot take all this traffic. Roads with any slowing of traffic will be a complete failure. The development is too much for this side of Kenilworth and will cause rat runs
b) Drainage issues
c) Air pollution will be a major problem from A46/development traffic
d) HS2 and this development will be a nightmare during construction and then once built with new school traffic to the relocated school
a) The road system cannot take all this traffic. Roads with any slowing of traffic will be a complete failure. The development is too much for this side of Kenilworth and will cause rat runs
b) Drainage issues
c) Air pollution will be a major problem from A46/development traffic
d) HS2 and this development will be a nightmare during construction and then once built with new school traffic to the relocated school