BASE HEADER

Cefnogi

Publication Draft

ID sylw: 7396

Derbyniwyd: 24/09/2009

Ymatebydd: Europa Way Consortium

Asiant : Entec UK Ltd

Crynodeb o'r Gynrychiolaeth:

We note that evidence that will inform a Sustainable Buildings policy is still being prepared. The Consortium believes evidence on the viability of on-site renewable energy targets and Code levels is vital. The Consortium looks forward to responding to this policy at the Draft Core Strategy stage.

The Consortium will aim to provide on-site low carbon, decentralised, or renewable energy sources at Europa Way as part of an integrated scheme following consideration of a range of viability tests at the time of development.