BASE HEADER
Gwrthwynebu
Publication Draft
ID sylw: 7676
Derbyniwyd: 23/09/2009
Ymatebydd: Ray Bullen
To achieve employment land to support housing requirement, unnecessary to develop Grade 2 agricultural land - sufficient sites available on brownfield, lower grade land and sites at edge of Coventry.
Not necessary to re-classify arable land for employment before all long-neglected employment land has been utilized. Imperative grade 2 farmland not developed.
Would lose significant piece of high landscape quality countryside that is larger than plan suggests.Building on one side of valley would ruin aspect from other.
Will destroy Tach Brook Valley buffer between town and village to dimensions too small to be effective. Disastrous if land covered with factories/employment land rubbish.