BASE HEADER

No

Preferred Options 2025

ID sylw: 86166

Derbyniwyd: 13/01/2025

Ymatebydd: Miss Lucy Farrington-Smith

Crynodeb o'r Gynrychiolaeth:

As per Draft Policy- J- Reducing Flood Risk: New development should be prioritised to areas of lowest flood risk, i.e. the areas that are least prone to flooding in event of a heavy rains or storms and must not increase flood risk elsewhere. This land is necessary to capture rainwater run-off, and will compromise existing infrastructure and housing nearby if built on. It is greenbelt and should stay as such.