BASE HEADER
No
Preferred Options 2025
ID sylw: 86873
Derbyniwyd: 30/01/2025
Ymatebydd: Julia Richards
Crynodeb o'r Gynrychiolaeth:
I feel that this plan, combined with those being proposed by Solihull cc will create too large an urban area for the infrastructure (roads, sewers, doctors etc) to cope with. The Stratford Road in Hockley Heath always floods when it rains and this will be worse if the surrounding fields are built in