BASE HEADER
No
Preferred Options 2025
ID sylw: 87265
Derbyniwyd: 07/02/2025
Ymatebydd: Mrs Julie Parry
Crynodeb o'r Gynrychiolaeth:
The existing main Alcester Road through King's Coughton is already permanently busy, and floods in heavy rain. Building on the land highlighted will put too much pressure on the existing road network, and undoubtedly add to the flooding issues, as water drains down the slope from the proposed area towards to the main road. You'll destroy greenbelt land, disturb wildlife, and Alcester as a town doesn't have the transport links (no train service) and services (no big supermarket) to support this new development.