BASE HEADER

Other

Preferred Options 2025

ID sylw: 87299

Derbyniwyd: 08/02/2025

Ymatebydd: Philip Sykes

Crynodeb o'r Gynrychiolaeth:

YES. Support the proposals in the Introduction .However, locations detailed in Fig 6 & table 5 appear to be driven by Call for Sites data rather than by determining where growth is desirable and then researching land availability. For example growth is not desirable in SG17 as it does not fit any of the desirable attributes of a 'growth corridor'. The infrastructure is not capable of supporting the last ten years growth let alone future growth. Yet as a large area of green field land has been offered for sites is seems as though this has driven its SG designation.