BASE HEADER
No
Preferred Options 2025
ID sylw: 87738
Derbyniwyd: 10/02/2025
Ymatebydd: Mr Paul Shambrook
Crynodeb o'r Gynrychiolaeth:
The road network in and around Cubbington cannot cope already with the current traffic.
There are already accidents weekly at the roundabout outside St Teresa's Catholic Primary School.
A lot of Greenbelt to the east of Cubbington has been lost due to HS2 and the SG05 parcel of land represents the only remaining accessible countryside for the village and local wildlife.
The storm drains are stretched with the amount of water currently running into them and building on the surrounding fields will increase the chances of flooding.
The village will lose its identity merging with Lillington