BASE HEADER
No
Preferred Options 2025
ID sylw: 87864
Derbyniwyd: 11/02/2025
Ymatebydd: Mr Paul Ingram
Crynodeb o'r Gynrychiolaeth:
1. Increased Traffic volume using Snitterfield as a cut through from Bearley to the A46. 2. Increased strain on existing services. NHS. Schools. Public Transport. 3. Destruction of vital greenbelt land. 4. Destruction of wildlife habitat. 5. Increased Carbon footprint. 6. Appalling effect on existing property prices 7. Destruction of image of "British Countryside" to tourists. 8. Damage to woodland habitats 9. Drainage issues caused by building into existing land and creating concrete rafts that destroy natural drainage. 10. Flooding caused by water movement from a poorly drained site into existing drainage that is critical in its capacity now.