BASE HEADER
Yes
Preferred Options 2025
ID sylw: 88577
Derbyniwyd: 16/02/2025
Ymatebydd: Mr Michael Brearley
Crynodeb o'r Gynrychiolaeth:
Impact on the potential size of the ring road to be considered as well as route towards Alcester. This is already a heavy traffic area so increasing the housing likely creates the need for some form of dual carriage way to ensure that traffic doesn't become a significant problem