BASE HEADER

Other

Preferred Options 2025

ID sylw: 88881

Derbyniwyd: 15/02/2025

Ymatebydd: Mr Rakesh Sharma

Crynodeb o'r Gynrychiolaeth:

I would like to express my concerns during the SWLP consultation. Firstly, the proposed area is a flood plain, and building on it will exacerbate flooding. There is also a tenant farmer whose livelihood will be affected. I oppose further greenbelt development, as numerous alternative options already exist. Additionally, HS2 should be included in the plan, as it will impact the landscape. I urge the removal of site 569 from consideration due to its flood risk, greenbelt significance, and severe infrastructure limitations, which render it unsuitable for development.