BASE HEADER

No

Preferred Options 2025

ID sylw: 89442

Derbyniwyd: 20/02/2025

Ymatebydd: Mrs Carolyn Lindsay

Crynodeb o'r Gynrychiolaeth:

We understand that B1 Hatton station (4.9) has been identified as a preferred option site.
It is at the top of a hill and the gradients have been averaged out fields and station road Hatton already floods.
All railways are at capacity Hatton station not enough parking or train capacity to required destinations.
Not viable road infrastructure over canal and railway bridge and connecting narrow country lanes.
New residents will commute to work by car increasing current road congestion onto the A4177 and the A46
green belt needs to be saved to stop the urban sprawl