BASE HEADER

No

Preferred Options 2025

ID sylw: 89624

Derbyniwyd: 21/02/2025

Ymatebydd: Mrs Emma Arrowsmith

Crynodeb o'r Gynrychiolaeth:

Transport infrastructure - cannot deliver sustainable travel behaviour, very poor train infrastructure, one line, limited service, between Birmingham and Stratford only. Surrounding road network is typically narrow country lanes with high hedges, unsuited to high volumes of traffic.
Utilities infrastructure is poor - regular power cuts, poor wifi and phone signals.
Unsuitable on landscape grounds - very hilly, open location, susceptible to frequent surface water flooding, green belt area sensitive from a heritage and setting viewpoint, with listed buildings and conservation areas nearby, the proposed building densities are completely out of character for the area, high value area for biodiversity.