BASE HEADER
Yes
Preferred Options 2025
ID sylw: 89849
Derbyniwyd: 21/02/2025
Ymatebydd: Dr Stephen Browett
Crynodeb o'r Gynrychiolaeth:
The local road infrastructure has much more capacity which could handle increased demand from new homes. As well as the road infrastructure, there is potential for new railway station to be introduced on the existing Chiltern line which would only be 2 miles from the development site.
Development on this land would satisfy housing needs while not needing to develop on green belt land.