BASE HEADER
No
Preferred Options 2025
ID sylw: 90039
Derbyniwyd: 22/02/2025
Ymatebydd: Liam Soutter
Crynodeb o'r Gynrychiolaeth:
The infrastructure (public transport and roads) in the area cannot support (or be expanded to support) a settlement of this size - a location closer to a large town or directly on major transport lines would be more realistic, especially when considering public transport links and cycling routes. I think this is a really important consideration with regard to sustainability and encouraging more use of public transport. The roads are also unable to support large construction vehicles getting to the building site, as all access is via narrow lanes and small bridges.