BASE HEADER
No
Preferred Options 2025
ID sylw: 90475
Derbyniwyd: 23/02/2025
Ymatebydd: Jayne Jones
Crynodeb o'r Gynrychiolaeth:
There is a complete lack of consideration with proposed SG areas for consdieration to be given to population density/existing infrastructure options. No evidence that consideration given to areas where expansion is viable as infrastructure already in place.